{"database":"biostudies-literature","file_versions":[],"scores":null,"additional":{"omics_type":["Unknown"],"volume":["25(1)"],"submitter":["Lockwood P"],"pubmed_abstract":["<h4>Background</h4>The National Healthcare Service (NHS) radiology service delivery in London is representative of the current pressures and challenges faced in England of Musculoskeletal (MSK) X-ray reporting workforce shortages, and national turnaround time (TATs) targets. The implementation project evaluated facilitation as a strategy to achieve the NHS England 50% target for all MSK X-rays to be reported by radiographers.<h4>Methods</h4>The project was an eight-month multi-centre (n = 5 London NHS Trusts) study applying the Promoting Action on Research Implementation in Health Services (PARIHS) framework with embedded mixed-methods evaluation. Initial observational data using the Context Assessment Index (CAI) tool and the Workplace Culture Critical Analysis Tool (WCCAT) set the implem"],"journal":["BMC health services research"],"pagination":["248"],"full_dataset_link":["https://www.ebi.ac.uk/biostudies/studies/S-EPMC11827166"],"repository":["biostudies-literature"],"pubmed_title":["An implementation facilitation intervention to improve the musculoskeletal X-ray reporting by radiographers across London."],"pmcid":["PMC11827166"],"pubmed_authors":["Lockwood P","Compton E","Burton C","Hayes N","Shaw T","Woznitza N","Patterson S","Groombridge H","O'Brien A","Mane U"],"additional_accession":[]},"is_claimable":false,"name":"An implementation facilitation intervention to improve the musculoskeletal X-ray reporting by radiographers across London.","description":"<h4>Background</h4>The National Healthcare Service (NHS) radiology service delivery in London is representative of the current pressures and challenges faced in England of Musculoskeletal (MSK) X-ray reporting workforce shortages, and national turnaround time (TATs) targets. The implementation project evaluated facilitation as a strategy to achieve the NHS England 50% target for all MSK X-rays to be reported by radiographers.<h4>Methods</h4>The project was an eight-month multi-centre (n = 5 London NHS Trusts) study applying the Promoting Action on Research Implementation in Health Services (PARIHS) framework with embedded mixed-methods evaluation. Initial observational data using the Context Assessment Index (CAI) tool and the Workplace Culture Critical Analysis Tool (WCCAT) set the implem","dates":{"release":"2025-01-01T00:00:00Z","publication":"2025 Feb","modification":"2025-04-04T11:58:04.479Z","creation":"2025-04-04T11:58:04.479Z"},"accession":"S-EPMC11827166","cross_references":{"pubmed":["39948540"],"doi":["10.1186/s12913-025-12356-x"]}}