<HashMap><database>biostudies-literature</database><scores/><additional><omics_type>Unknown</omics_type><volume>13</volume><submitter>Bourika K</submitter><pubmed_abstract>&lt;h4>Objective&lt;/h4>This study was designed to reevaluate and improve the quality and safety of the chemotherapy preparation in a Central Chemotherapy Preparation Unit of a Public Hospital.&lt;h4>Methods&lt;/h4>A failure modes, effects, and criticality analysis (FMECA) was conducted by a multidisciplinary team. All potential failure modes at each stage of the chemotherapy preparation were recorded, and the associated risks were scored for their severity, occurrence, and detectability with a risk priority number (RPN). Corrective actions were suggested, and new RPNs were estimated for the modified process.&lt;h4>Results&lt;/h4>Failure modes, effects, and criticality analysis and priority matrix construction, revealed that the partial compliance of Unit's premises with international standards (RPN&lt;sub>sta</pubmed_abstract><journal>Clinical Medicine Insights. Oncology</journal><pagination>1179554919852933</pagination><full_dataset_link>https://www.ebi.ac.uk/biostudies/studies/S-EPMC6558536</full_dataset_link><repository>biostudies-literature</repository><pubmed_title>Improvement of Chemotherapy Solutions Production Procedure in a Hospital Central Chemotherapy Preparation Unit: A Systematic Risk Assessment to Prevent Avoidable Harm in Cancer Patients.</pubmed_title><pmcid>PMC6558536</pmcid><pubmed_authors>Tsiata E</pubmed_authors><pubmed_authors>Bourika K</pubmed_authors><pubmed_authors>Vicha A</pubmed_authors><pubmed_authors>Kalofonos H</pubmed_authors><pubmed_authors>Avgoustakis K</pubmed_authors><pubmed_authors>Panagi Z</pubmed_authors><pubmed_authors>Papadimitriou E</pubmed_authors><pubmed_authors>Koutras A</pubmed_authors></additional><is_claimable>false</is_claimable><name>Improvement of Chemotherapy Solutions Production Procedure in a Hospital Central Chemotherapy Preparation Unit: A Systematic Risk Assessment to Prevent Avoidable Harm in Cancer Patients.</name><description>&lt;h4>Objective&lt;/h4>This study was designed to reevaluate and improve the quality and safety of the chemotherapy preparation in a Central Chemotherapy Preparation Unit of a Public Hospital.&lt;h4>Methods&lt;/h4>A failure modes, effects, and criticality analysis (FMECA) was conducted by a multidisciplinary team. All potential failure modes at each stage of the chemotherapy preparation were recorded, and the associated risks were scored for their severity, occurrence, and detectability with a risk priority number (RPN). Corrective actions were suggested, and new RPNs were estimated for the modified process.&lt;h4>Results&lt;/h4>Failure modes, effects, and criticality analysis and priority matrix construction, revealed that the partial compliance of Unit's premises with international standards (RPN&lt;sub>sta</description><dates><release>2019-01-01T00:00:00Z</release><publication>2019</publication><modification>2025-04-04T21:28:07.32Z</modification><creation>2019-07-24T07:14:18Z</creation></dates><accession>S-EPMC6558536</accession><cross_references><pubmed>31217699</pubmed><doi>10.1177/1179554919852933</doi></cross_references></HashMap>