Ontology highlight
ABSTRACT: Background
On December 29, 2021, during the delta wave of the Coronavirus Disease 2019 (COVID-19) pandemic, the stock of premanufactured solutions used for continuous kidney replacement therapy (CKRT) at the University of New Mexico Hospital (UNMH) was nearly exhausted with no resupply anticipated due to supply chain disruptions. Within hours, a backup plan, devised and tested 18 months prior, to locally produce CKRT dialysate was implemented. This report describes the emergency implementation and outcomes of this on-site CKRT dialysate production system.Methods
This is a single-center retrospective case series and narrative report describing and reporting the outcomes of the implementation of an on-site CKRT dialysate production system. All adults treated with locally prod
SUBMITTER: Teixeira JP
PROVIDER: S-EPMC10463836 | biostudies-literature | 2023 Aug
REPOSITORIES: biostudies-literature