Production scheduling of prefabricated components considering delivery methods.
Ontology highlight
ABSTRACT: To address the processing scheduling problem involving multiple molds, components, and floors, we propose the Genetic Grey Wolf Optimizer (GGA) as a means to optimize the production scheduling of components in a production line. This approach combines the Grey Wolf algorithm with the genetic algorithm. Previous methods have overlooked the storage requirements arising from the delivery characteristics of prefabricated components, often resulting in unnecessary storage costs. Intelligent algorithms have been demonstrated to be effective in production scheduling, and thus, to enhance the efficiency of prefabricated component production scheduling, our study presents a model incorporating a production objective function. This model takes into account production resources and delivery character
SUBMITTER: Wang S
PROVIDER: S-EPMC10497527 | biostudies-literature | 2023 Sep
REPOSITORIES: biostudies-literature
ACCESS DATA