Unknown

Dataset Information

Multi-objective optimization of dual resource integrated scheduling problem of production equipment and RGVs considering conflict-free routing.


ABSTRACT: In flexible job shop scheduling problem (FJSP), the collision of bidirectional rail guided vehicles (RGVs) directly affects RGVs scheduling, and it is closely coupled with the allocation of production equipment, which directly affects the production efficiency. In this problem, taking minimizing the maximum completion time of RGVs and minimizing the maximum completion time of products as multi-objectives a dual-resource integrated scheduling model of production equipment and RGVs considering conflict-free routing problem (CFRP) is proposed. To solve the model, a multi-objective improved discrete grey wolf optimizer (MOID-GWO) is designed. Further, the performance of popular multi-objective evolutionary algorithms (MOEAs) such as NSGA-Ⅱ, SPEA2 and MOPSO are selected for comparative test. Th

SUBMITTER: Zhang Q 

PROVIDER: S-EPMC10834064 | biostudies-literature | 2024

REPOSITORIES: biostudies-literature