Unknown

Dataset Information

Change in sediment transport regime of the Keelung River in Taiwan induced by the operation of Yuanshantze flood diversion tunnel.


ABSTRACT: The impact of flood diversion channels on river sediment transport has been rarely reported. This study uses the Yuanshantze flood diversion tunnel (YFDT), which was commissioned in July 2005 in Taiwan, as an example. This study calculates the sediment transport in the Keelung River from 1997 to 2018 by using seasonal rating curves, in the form of aQb. Changes in rating curve coefficients are also analyzed to understand the impact of YFDT on sediment transport regime. The results show that after the construction of YFDT, the annual sediment transport dropped from 0.59 ± 0.47 [Mt y-1] to 0.17 ± 0.09 [Mt y-1], leading to dampened inter- and intra-annual variation. Before flood diversion, the Keelung River requires ~1% cumulative time to export 50% cumulated sediment loads, but it takes ~4.5%

SUBMITTER: Lee TY 

PROVIDER: S-EPMC11670950 | biostudies-literature | 2024

REPOSITORIES: biostudies-literature