Dual-objective optimization of prefabricated component logistics based on JIT strategy.
Ontology highlight
ABSTRACT: Prefabricated construction involves manufacturing components in a factory and then transporting them to a construction site for assembly, yielding resource savings and improved efficiency. However, the large size and weight of prefabricated components, along with strict delivery requirements, introduce logistical challenges, such as increased carbon emissions during transport and site congestion. This study addresses the dual-objective vehicle scheduling problem for prefabricated components. It proposes a dual-objective optimization model for prefabricated component logistics, guided by the Just-In-Time (JIT) strategy. The model comprehensively considers on-site and off-site logistics, accounts for uncertainties, and details the logistics process for each component. Its objectives are to r
SUBMITTER: Zhang C
PROVIDER: S-EPMC11682132 | biostudies-literature | 2024 Dec
REPOSITORIES: biostudies-literature
ACCESS DATA