Unknown

Dataset Information

Using a "Kickoff" to build implementation partner teams and action plans for active implementation of a quality improvement project.


ABSTRACT:

Introduction

A strategy for transitioning implementation successfully from pre-implementation to active implementation is to hold a team "kickoff." The objectives of this manuscript are: (1) to present the frameworks that guided the development of the Protocol-guided Rapid Evaluation of Veterans Experiencing New Transient neurological symptoms (PREVENT) kickoff strategy, (2) describe design elements of the kickoff and how they contribute to achieving PREVENT kickoff aims; forming teams, developing an action plan, and launching active implementation (3) examine the perceived usefulness of those kickoff design elements toward achieving kickoff aims.

Methods

PREVENT was a stepped-wedge trial to improve the quality of Transient Ischemic Attack (TIA) care at six Veterans Affairs

SUBMITTER: Baird SA 

PROVIDER: S-EPMC12185449 | biostudies-literature | 2025

REPOSITORIES: biostudies-literature