Robust optimization for multi-project scheduling via the critical chain method.
Ontology highlight
ABSTRACT: The critical chain method is often used to improve robustness in single-project scheduling, but there are two challenges when applying it to multi-project scheduling. First, the existing robustness measure focuses on time elasticity within sub-projects but neglects elasticity across sub-projects, making it difficult to balance drum resource requirements. Second, the differential evolution (DE) algorithm is adopted to solve this problem, but continuous evolutionary operators have limited flexibility, leading to numerous transformations between the continuous solution space and the discrete problem space. Therefore, we adjust the critical chain multi-project scheduling model by incorporating the drum buffer and the capacity constraint buffer and propose a robustness measure that considers bo