The vapor-phase multi-stage CMD test for characterizing contaminant mass discharge associated with VOC sources in the vadose zone: Application to three sites in different lifecycle stages of SVE operations.
Ontology highlight
ABSTRACT: Vapor-phase multi-stage contaminant mass discharge (CMD) tests were conducted at three field sites to measure mass discharge associated with contaminant sources located in the vadose zone. The three sites represent the three primary stages of the soil vapor extraction (SVE) operations lifecycle-pre/initial-SVE, mid-lifecycle, and near-closure. A CMD of 32g/d was obtained for a site at which soil vapor SVE has been in operation for approximately 6years, and for which mass removal is currently in the asymptotic stage. The contaminant removal behavior exhibited for the vapor extractions conducted at this site suggests that there is unlikely to be a significant mass of non-vapor-phase contaminant (e.g., DNAPL, sorbed phase) remaining in the advective domains, and that most remaining mass is li
SUBMITTER: Brusseau ML
PROVIDER: S-EPMC4520789 | biostudies-literature | 2015 Aug
REPOSITORIES: biostudies-literature
ACCESS DATA