Unknown

Dataset Information

0

Predicting Discharge Dates From the NICU Using Progress Note Data.


ABSTRACT: Discharging patients from the NICU may be delayed for nonmedical reasons including the need for medical equipment, parental education, and children's services. We describe a method to predict which patients will be medically ready for discharge in the next 2 to 10 days, providing lead time to address nonmedical reasons for delayed discharge.A retrospective study examined 26 features (17 extracted, 9 engineered) from daily progress notes of 4693 patients (103,206 patient-days) from the NICU of a large, academic children's hospital. These data were used to develop a supervised machine learning problem to predict days to discharge (DTD). Random forest classifiers were trained by using examined features and International Classification of Diseases, Ninth Revision-based subpopulations to determine the most important features.Three of the 4 subpopulations (premature, cardiac, gastrointestinal surgery) and all patients combined performed similarly at 2, 4, 7, and 10 DTD with area under the curve (AUC) ranging from 0.854 to 0.865 at 2 DTD and 0.723 to 0.729 at 10 DTD. Patients undergoing neurosurgery performed worse at every DTD measure, scoring 0.749 at 2 DTD and 0.614 at 10 DTD. This model was also able to identify important features and provide "rule-of-thumb" criteria for patients close to discharge. By using DTD equal to 4 and 2 features (oral percentage of feedings and weight), we constructed a model with an AUC of 0.843.Using clinical features from daily progress notes provides an accurate method to predict when patients in the NICU are nearing discharge.

SUBMITTER: Temple MW 

PROVIDER: S-EPMC5524203 | biostudies-literature | 2015 Aug

REPOSITORIES: biostudies-literature

altmetric image

Publications

Predicting Discharge Dates From the NICU Using Progress Note Data.

Temple Michael W MW   Lehmann Christoph U CU   Fabbri Daniel D  

Pediatrics 20150801 2


<h4>Background and objectives</h4>Discharging patients from the NICU may be delayed for nonmedical reasons including the need for medical equipment, parental education, and children's services. We describe a method to predict which patients will be medically ready for discharge in the next 2 to 10 days, providing lead time to address nonmedical reasons for delayed discharge.<h4>Methods</h4>A retrospective study examined 26 features (17 extracted, 9 engineered) from daily progress notes of 4693 p  ...[more]

Similar Datasets

| S-EPMC10867966 | biostudies-literature
| S-EPMC10916318 | biostudies-literature
| S-EPMC6298834 | biostudies-literature
| S-EPMC4768305 | biostudies-literature
| S-EPMC7703481 | biostudies-literature
| S-EPMC11574281 | biostudies-literature
| S-EPMC8460846 | biostudies-literature
| S-EPMC9184279 | biostudies-literature
| S-EPMC9299776 | biostudies-literature
| S-EPMC11012877 | biostudies-literature