No increase in readmissions or adverse events after implementation of fast-track program in total hip and knee replacement at 8 Swedish hospitals: An observational before-and-after study of 14,148 total joint replacements 2011-2015.
Ontology highlight
ABSTRACT: Background and purpose - Fast-track care programs in elective total hip and knee replacement (THR/TKR) have been introduced in several countries during the last decade resulting in a significant reduction of hospital stay without any rise in readmissions or early adverse events (AE). We evaluated the risk of readmissions and AE within 30 and 90 days after surgery when a fast-track program was introduced in routine care of joint replacement at 8 Swedish hospitals. Patients and methods - Fast-track care programs were introduced at 8 public hospitals in Västra Götaland region from 2012 to 2014. We obtained data from the Swedish Hip and Knee Arthroplasty Registers for patients operated with THR and TKR in 2011-2015. All readmissions and new contacts with the health care system within 3 months
SUBMITTER: Berg U
PROVIDER: S-EPMC6202734 | biostudies-literature | 2018 Oct
REPOSITORIES: biostudies-literature
ACCESS DATA