Assessment of Motor Planning and Inhibition Performance in Non-Clinical Sample-Reliability and Factor Structure of the Tower of London and Go/No Go Computerized Tasks.
Ontology highlight
ABSTRACT: In two studies, we examine the test-retest reliability and factor structure of the computerized Tower of London (TOL) and Go/No Go (GNG). Before analyses, raw results of variables that were not normally distributed were transformed. Study 1 examined the reliability of a broad spectrum of indicators (Initial Time Thinking, ITT; Execution Time, ET; Full Time, FT; Extra Moves, EM; No Go Errors, NGE; Reaction Time for Go Responses, RTGR) across an eight-week delay in a sample of 20 young adults. After correction for multiple comparisons and correlations, our results demonstrate that the tasks have ambiguous test-retest reliability coefficients (non-significant r for all indicators, and interclass correlation (ICC) for TOL; significant ICC for GNG; show lack of reliable change over time for all
SUBMITTER: Tyburski E
PROVIDER: S-EPMC8615804 | biostudies-literature | 2021 Oct
REPOSITORIES: biostudies-literature
ACCESS DATA