Unknown

Dataset Information

Life cycle impact assessment and life cycle cost assessment for centralized and decentralized wastewater treatment plants in Thailand.


ABSTRACT: This research investigates the cost-effectiveness of four sludge treatment scenarios for centralized (C) and decentralized (D) wastewater treatment plants (WWTP) using life cycle cost assessment (LCCA). The environmental impacts and costs are quantified by Stepwise2006. The most environmentally and financially viable WWTP construction option for Bangkok, Thailand (2022-2031) is determined in terms of LCCA and net present value (NPV). The environmental costs of D-treatment scenarios are lower than those of C-treatment scenarios. The total environmental costs of C- and D-fertilizer scenarios are lower than those of C- and D-dewatering scenarios. The net cash flow per functional unit of C-WWTPs is higher than that of D-WWTPs. The C-fertilizer scenario is the most environmentally and economica

SUBMITTER: Prateep Na Talang R 

PROVIDER: S-EPMC9411131 | biostudies-literature | 2022 Aug

REPOSITORIES: biostudies-literature