Unknown

Dataset Information

Cost-effectiveness analysis of induction of labour at 41 weeks and expectant management until 42 weeks in low risk women (INDEX trial).


ABSTRACT:

Objective

To assess the cost-effectiveness of elective induction of labour (IOL) at 41 weeks and expectant management (EM) until 42 weeks.

Design

Cost-effectiveness analysis from a healthcare perspective alongside a randomised controlled trial (INDEX).

Setting

123 primary care midwifery practices and 45 obstetric departments of hospitals in the Netherlands.

Population

We studied 1801 low-risk women with late-term pregnancy, randomised to IOL at 41 weeks (N = 900) or EM until 42 weeks (N = 901).

Methods

The incremental cost-effectiveness ratio (ICER) was expressed as the ratio of the difference in costs and the difference in main perinatal outcomes. A Cost-Effectiveness Acceptability Curve (CEAC) was constructed to assess whether induction is cost-effecti

SUBMITTER: Bruinsma A 

PROVIDER: S-EPMC9900343 | biostudies-literature | 2023 Mar

REPOSITORIES: biostudies-literature